"Do I stop?" or "Do I go?" That is how Rob Gleam, managing partner at Bamboo Willies, described the scene on a big weekend at the Pensacola Beach entrance in a WEAR-TV report in September. He called the old toll booth "an eyesore" and said the change would "definitely" improve traffic flow at the entrance.
Anyone who has crossed the Bob Sikes Bridge knows the pause he means. Drivers slow down at a booth that hasn't taken cash in more than six years. That pause is going away. Escambia County is replacing the plaza with an overhead gantry, and weekday lane shifts on Pensacola Beach Boulevard are expected to end Friday, Oct. 30.
The gantry fixes the gate. The congestion county commissioners have described this year is a different problem: too many cars and too few places to put them once they're on the island. The next recommendations on traffic are due from a county study set to run through the end of November.
What replaces the booths, and when
The county calls the work the Pensacola Beach Gateway Improvements project. It covers demolishing the existing booths and building "a new gateway structure and tolling system" so vehicles can move on and off Santa Rosa Island more efficiently while the county still collects the toll. WEAR reported that the new gantry will carry toll-by-plate equipment, CCTV cameras and fiber optic communications. The county puts the cost at about $6.5 million and says the project will reduce congestion and give emergency vehicles better access.
The schedule has already slipped once. The Pensacola News Journal reported in early September that the gantry and booth demolition were supposed to be done in June, but the contractor missed that deadline. Here is how the dates line up now:
- Dec. 1, 2025. Construction notice to proceed. The county project page lists Jacobs Engineering as engineer and Green-Simmons as contractor.
- April 1, 2026. Construction reached 25% complete.
- Sept. 14, 2026. Weekday lane closures and shifts resumed at the toll plaza after the summer season.
- October 2026. Booth demolition is scheduled for this month. PNJ put it in mid-to-late October.
- Friday, Oct. 30, 2026. Lane-shift roadwork is expected to wrap, weather and construction coordination permitting.
- November 2026. The county's anticipated final completion for the full project.
- December 2026 to December 2028. Anticipated warranty period.
So the Oct. 30 date and the November date are two different milestones. Oct. 30 ends the daily lane shifts. November is when the county expects to close out the whole job. District 4 Commissioner Ashlee Hofberger told WEAR that once the booths come out, "lane and median work and technology installations will begin." Some work at the entrance could still be visible after the lane shifts end.
The toll is still a dollar
Removing the booths doesn't remove the fee. WEAR said so directly: the new structure "doesn't mean fees to access the beach are going away."
Cashless tolling isn't new either. According to the county's Pensacola Beach toll page, the $1 Bob Sikes toll has been collected electronically since March 20, 2020, with no cash or coins taken in person. The page lists the payment options as SunPass, E-Pass, NC Quick Pass, Peach Pass, E-ZPass, tolling apps, SunPass Toll-by-Plate and the county's own annual pass. Here's how the costs compare, per that page:
- SunPass: $1 per crossing, deducted automatically.
- Toll-by-Plate: $1 per crossing plus a $2.50 administrative fee, charged once per billing cycle no matter how many trips you take.
- Public Annual Pass: $20 per year for unlimited crossings.
- Commercial Annual Pass: $70 per year. The county applies it to any vehicle with commercial markings or advertising, including magnetic or rooftop signs, and to vehicles owned by a business.
- Homestead Residents: $5 per pass, up to two passes. The county verifies homestead status through the Escambia County Tax Office and defines a homestead resident as someone who lives at a primary residence on Pensacola Beach 50% or more of the year. These passes are limited to two-axle noncommercial vehicles.
All annual passes run through SunPass. You need an active transponder before you can enroll, and the county says it can take two to four hours after buying the transponder before you can buy the pass. Your SunPass account also needs at least a $10 balance to buy or renew an annual pass, and if the balance drops to $0 or below, both the SunPass and the annual pass stop working. This is general information, not legal or financial advice. Check eligibility and terms with Escambia County's customer service office at 850-916-5421 or 850-916-5415 before you count on a particular pass.
The gantry project is a physical change at the entrance. It takes away the booth that made drivers hesitate at the bridge, and the county's toll page is the place to check rates and payment options as the new system comes online.
A faster gate leads onto the same island
The entrance was never the whole story. In a February WEAR report, District 2 Commissioner Mike Kohler said that "from spring until fall, we're hitting record numbers almost every week," and added, "the island's not getting bigger and more and more people are coming."
The same report gave the clearest measure of the change. A previous traffic study, completed in 2012, found about 12 days a year when the island had enough traffic to cause congestion. That number is now closer to 60 days a year. That's roughly five times as many jammed days as the island saw 14 years ago, and none of the problem days in that count happen at the toll plaza.
Mike Pinzone, owner of Papa's Pizza on the beach, told WEAR in that February report that some customers cancel online orders because they can't find a place to park. He described drivers circling for spots and blocking traffic, which he said hits hardest at businesses without their own parking garages. Parking also came up during the Pensacola Beach Mardi Gras Parade earlier this year, WEAR reported.
A smoother gantry gets cars onto Santa Rosa Island a little faster. Once they're across, they still meet the same parking lots and the same circling traffic on those 60-odd busy days.
Two studies, one open question
The county has studied this problem more than once this year. In February, WEAR reported on a year-long parking and traffic study, designed to capture parking in every season, that was expected to be completed in June, with the data shared publicly afterward. In September, WEAR reported that the county is running a traffic management study through the end of November to measure how many cars pass through the former toll booth area, and that it will return recommendations to commissioners.
Hofberger has been specific about what she wants answered. She proposed a parking garage about a year before the February report and said she still believed the Casino Beach parking lot would be the best site. She framed the open questions in practical terms: "Where would we put it? How big does the parking garage need to be and how would you efficiently get people in and out of the parking garage?" Then she added, "just providing more places to park isn't really a fix to the problem. We need to be able to move people efficiently."
In September she described the priorities this way: "Our top priority was traffic on the beach and how to make it flow better, removing the people from the cars, so how do we make it safer for bikers and walkers without putting them next to the traffic, and also if we are going to have a parking garage."
Taken together, those statements cover three questions: whether a garage gets built, where it goes, and how people on foot and on bikes get separated from car traffic on the island. The gantry project answers none of them. Recommendations from the November study go back to commissioners, who decide what comes next.
The bridge between now and Oct. 30
For the week after this post goes up, the county's September notice still applies. Lane closures and shifts at the toll plaza run 24 hours a day, Monday through Friday. Crews remove them by 5 p.m. each Friday and put them back by 7 a.m. Monday, so Saturdays and Sundays stay clear. The county asks drivers to use extra caution, follow road crews and posted signs, and says it will issue a new notice if more closures are needed or the work runs late.
If you'd rather skip the drive altogether, the county toll page lists other ways onto the island: ECAT bus routes 61 and 64, the ferry, a bike or walking. Those are also the kinds of trips Hofberger's "removing the people from the cars" priority points toward, which makes them the options to watch when the study's recommendations come back after November.
Gateway projects and parking studies tend to come up when people weigh a home or condo on the island, from the toll you'll pay to how easy it is to get home on a busy Saturday. If you own on Pensacola Beach and want to know how changes at the entrance might figure into your property's value, Jason & Charlcie Smallwood can walk you through it. Get your free home valuation, and we'll keep you posted as the county's recommendations come in.